Changes

Jump to: navigation, search

Severn Valley Railway Timeline 2020-2029

167 bytes added, 13:04, 26 February 2020
Parry People Mover on test 2/2020
:The [[Bridgnorth#Footbridge_outside_Bridgnorth_Station|Footbridge outside Bridgnorth Station]] was closed for repairs to the damaged holding down bolts discovered in [[Severn Valley Railway Timeline 2010-2019#2018|2018]].
:Storm Dennis, with heavy rain falling on already saturated ground, contributed to record highs on the [[River Severn]] and consequent widespread flooding. The SVR was fortunately mostly unscathed, although access to the SVR was disrupted during half-term running from 15 to 23 February.
:On 25 February PPM50 Parry People Mover Class 999 No. 999900 visited for testing. It was previously tested in [[Severn Valley Railway Timeline 2000-2009#2002|2002]].
==Steam locomotives used==
Trustworthy, administrator
6,649
edits

Navigation menu