The Severn Valley Railway under GWR/BR ownership

166 bytes added, 16:20, 13 October 2019
Construction: 1858-1861: add link
In February 1861, positioning of the four cast iron ribs of Victoria Bridge began. While work on the bridge was still in progress, the first steam working on the line took place between Stourport and Bewdley on 5 May 1861, watched by large crowds which had gathered for the occasion. Victoria Bridge was completed 5 days later. Station buildings were completed and signalling equipment installed in autumn of 1861.
 
Contemporary newspaper reports gave details of some of the many [[Railway Navvies of the SVR|accidents which took place during construction]] between 1859 and 1861.
A first inspection of the line was carried out in December 1861 by Col. Yolland of the Board of Trade’s Railway Inspectorate. His report, dated 30 December 1861, listed a number of matters to be addressed before he could recommend opening, including installation of a turntable at Hartlebury, adjustment to the layout at Buildwas station and re-positioning of signals. A second inspection was carried out on 15 January 1862; two days later two trains ran over the still incomplete railway calling at stations to deliver apparatus for working it. On 23 January Colonel Yolland's report recommended that the Board of Trade should approve the opening of the railway.<ref>[[Bibliography#Books|Marshall (1989)]] pp. 48-49.</ref>
Trustworthy, administrator
11,918
edits

Navigation menu