Changes

Jump to: navigation, search

Bewdley Tunnel

281 bytes added, 12:30, 13 October 2019
Info added
Bewdley tunnel ("Bridge" 6) is 480 yards long and is situated on the [[Acceptance Lever]] worked single line section between [[Kidderminster]] and [[Bewdley]].
When originally built in 1876-77 as part of the [[Kidderminster Loop Line]], the tunnel was lined with red brick and was 19ft wide. In 1876 two [[Railway Navvies of the SVR|workmen]] were killed and two seriously injured during its construction.<ref>[https://www.britishnewspaperarchive.co.uk/viewer/bl/0000250/18760318/010/0002 Sheffield Daily Telegraph, 18 March 1876]</ref>  Unfortunately the sandstone through which the tunnel passes deteriorates on contact with air, and within 10 years part of the arch had given way under the weight of sand. Over the next 20 years, further small sections of the tunnel were relined, but in 1908 the decision was taken for the tunnel to be fully relined with two rings of blue bricks set in cement. The work began on 12 June 1910 and was completed on 20 October 1910.<ref>[[Bibliography#Books|Marshall (1989)]] p. 92.</ref> For safety, an occupation instrument was installed at the Bewdley end of the tunnel, linked to the [[Kidderminster Junction signal box | Kidderminster Junction]] and [[Bewdley South signal box | Bewdley South]] signal boxes. After the last train of the day had cleared the section, withdrawal of the occupation key would prevent the release of the electric train staff at either end until work in the tunnel had been completed overnight and the occupation key replaced.<ref>SVR News 109, "Relaying of Bewdley Tunnel, 1910", John Marshall</ref>
<Gallery>
[[Stourport Road Bridge | Towards Kidderminster]]<br>
[[List of infrastructure]]<br>
[[Devil's Spittleful (Rifle Range) Bridge | Towards Bridgnorth]]<br>[[Railway Navvies of the SVR]]
==References==
Trustworthy, administrator
6,655
edits

Navigation menu