Changes

Jump to: navigation, search

Eardington

1 byte removed, 23:23, 5 March 2019
m
The platform: typo
The southern end of the platform was cut back after it collapsed. The Friends held a fundraising appeal in 2014 to replace the missing part;<ref>SVRA Working Members Newsletter November 2014</ref> it was reported on 27 October 2016 that sufficient funds had been raised to purchase the required replacement GWR bricks.<ref>[https://twitter.com/Eardingtonstn/status/791730973977219072 Eardington Station Twitter Feed], retrieved 1 November 2016</ref>
A project commenced during the January 2018 winter shutdown involving the partial rebuilding of the platform face.<ref>[https://svrtrust.org.uk/downloads/Platform%202018%20web%20version-1.pdf 'Platform' magazine, 2018 Issue 4, p.5]</ref> Some 8000 engineering bricks recovered from the London – Bristol mainline and donated by Kier Construction have been used. These have been cleaned up by the Friends of Eardington Station over a period of time and provide a genuine connection to the GWR. The rebuild was undertaken by JSR Construction who are based less than a mile away from the station, thus keeping the work local.<ref>[https://www.svrlive.com/eardington-station SVRLive 'Eardington Station' 13 January 2018]</ref><ref>[https://www.svrlive.com/winter-works-2018 'SVRLive Winter Works 2018' 16 January 2018]</ref> Work was completed on 31 January 2019, giving the station a full length working platform of 300' - roughly 5 coaches - for the first time since 1984. The £41,000 project was aided by donations from the [[Severn Valley Railway Charitable Trust Ltd| Charitable Trust]] and [[Severn Valley Railway Company Limited| the Guarantee Company]] of £6,500 each, with the remainder being raised by the Friends. The project was completed on time and on budget. <ref>[https://www.svrlive.com/eardington-station SVR Live Rebruary February 2019]</ref><ref>[https://www.shropshirestar.com/entertainment/bridgnorth-entertainment/2019/03/01/volunteers-on-severn-valley-railway-proud-to-unveil-new-platform/ Smith, R., 'Severn Valley Railway volunteers proud to unveil new platform', Shropshire Star, 1 March 2019] (Retrieved 3 March 2019)</ref> The rebuilding of the platform improves greatly the appearance of the station and allows consideration to its possible use on gala events at some point in the future.
===Proposed reopening===
Trustworthy, administrator
11,897
edits

Navigation menu