GWR 17410 'Toad' 20T Goods Brake Van

1 byte added, 17:02, 9 March 2018
m
edit link
It is intended to restore it to as near original condition as reasonably possible, and in GWR livery, but BR bauxite has not been ruled out as a possibility for the future.
During the summer/autumn of 2016, the vacuum brake cylinder and handbrake pedestal were removed to safe storage and the rotten steel veranda sides and underfloor platework were consigned to the scrapheap. A considerable amount of (very necessary) weld repair was then carried out by a skilled volunteer on the exposed section of underframe, ballast bins and bases of the cabin and side door posts.<ref>[httphttps://www.national-preservation.com/threads/svr-wagons-2016.631598/page-5 NatPres forum SVR Wagons Thread]</ref><ref>[http://www.lnersvrcoachfund.org.uk/gwrtoad17410prog2016.html 17410 restoration updates on www.lnersvrcoachfund.org.uk]</ref> A heavy job completed in early October was the emptying, cleaning, strengthening, painting and re-filling of all eight underfloor ballast bins.
New veranda side and end plates,underfloor support plates, kerb rails and corner posts were made and fitted by Mawley Engineering Ltd between 18-20 October 2016 to replace the thoroughly rotten originals. However the very prominent waist level angle irons, the two vertical "T" sections at the end, and the two side door slam posts were in good condition and have been refurbished and re-used. The new structure was seal welded to prolong its life expectancy, but volunteers have commenced the time consuming job of drilling the new steelwork for snap head rivets which will maintain the authentic look.
Trustworthy, administrator
11,886
edits

Navigation menu