Changes

Jump to: navigation, search

Bridgnorth

377 bytes added, 21:36, 19 January 2018
Footbridge outside Bridgnorth Station: Closed Jan 18 for repairs
File: Footbridge_outside_Bridgnorth_Station_20150411.jpg |The new footbridge
</gallery>
 
{{As of|2018|01}} the footbridge has been closed due to the station end lifting. It is hoped to make a temporary repair before the start of the running season.<ref>[https://www.shropshirestar.com/news/local-hubs/bridgnorth/2018/01/19/bridge-was-closed-after-end-was-discovered-hanging-dangerously-in-mid-air/ Shropshire Star 19 January 2018] (Retrieved 19 January 2018)</ref>
==== Platform 1 ====
Trustworthy, administrator
6,720
edits

Navigation menu