The winter of 1992/93 saw a major refurbishment by the SVR including installing a waterproof membrane and relaying of the track bed.<ref name=SVR106/> The viaduct has seen further major refurbishments since. In February 2018 work started on the long wing wall by contractors (Walsh Construction Ltd), using the same Cumbrian sandstone from St Bees quarry that the SVR have used elsewhere on the viaduct.<ref>[https://www.svrlive.com/winter-works-2018 SVRLive, 'Winter Works 2018', 21 March 2018]</ref>
 
Preventative maintenance planned for 2020-2021 was put on hold due to the effects of the [[2020 coronavirus disease (COVID-19) pandemic]]<ref>SVR(H) annual report and financial statements for the period ended 5 January 2020</ref>.