Closure: added Maggs' tale of wage paying after closure at Alveley in 1969
:North of Buildwas Junction, the line from Sutton Bridge Junction was kept open for the movement of boilers and other equipment to the new power station. This took place on Saturday 22 April 1966, after which the section to Berrington was closed and the track lifted. The section north of Berrington continued in use for the testing of Rolls Royce Sentinel diesel shunting engines until January 1968. From that time only a short spur of the old line remained open to serve the Shrewsbury Abbey sidings oil depot until that closed to rail traffic on 18 July 1988.<ref name=Magner32/>
:South of Alveley Colliery, the line southwards through Bewdley remained in use for moving coal to Stourport Power Station until the Colliery closed in , with the last coal lifted on 31 January 1969.For a short period following closure of the line from 6 February a class 25 diesel loco was rostered to take an 8T91 Thursday afternoons only light engine move from Kidderminster to Highley to carry the wage packets of the signalman and the shunter who were still stationed there, despite traffic having finished. A third man, a lengths man, was also stationed there but he had to travel on a platelayers trolley each week to Bewdley to collect his wages.<ref>[[Bibliography#Books|Maggs (2009)]]</ref>
:The line between Buildwas and Alveley Colliery Sidings was abandoned by BR. In 1964 they began to lift the track from Buildwas southwards for re-use in the enlargement of Bescot yard near Walsall. Fortunately sufficient material had been reclaimed by the time the north end of Bridgnorth Station was reached, so the workforce was redeployed to work on the Stourbridge Junction to Smethwick line.<ref>[[Bibliography#Books|Marshall (1989)]] p. 165.</ref>
Trustworthy, administrator
6,651
edits

Navigation menu