Changes

Jump to: navigation, search

Sharp Stewart 0-4-4T Dunrobin

98 bytes added, 23:57, 29 November 2017
Current status: update
The locomotive was exported to Canada in 1965, but acquired in January 2011 by the Beamish Living Museum of the North<ref>[http://www.beamish.org.uk/beamish-buys-dunrobin/ Beamish announcement]</ref> and repatriated to the UK. On arrival, Dunrobin was brought to Bridgnorth to be dismantled and the feasibility of restoration to working order assessed. Contracts were subsequently let for boiler and mechanical overhaul at [[Bridgnorth]].
==Current stausstatus==
{{As of|2017|0308}} the overhaul is making steady progress, with the boiler expected driving wheels to be complete by sent away for refurbishment, work on the end of that year locomotive's rear bogie truck completed, and work on the driving wheels expected chassis and boiler progressing to the extent that test steaming may be removed shortlypossible in 2018.<ref>SVR News No. 197199</ref> [http://beamishtransportonline.co.uk/category/dunrobin/ Beamish Transport Online blog] has regular updates on progress of the work which has necessitated many new parts including cylinder block, smokebox and boiler barrel sections.
The photograph below shows work in progress in March 2012.
Trustworthy, administrator
11,876
edits

Navigation menu