17 Dec 20 4930 Hagley Hall’s boiler arrived back from Northern Steam Engineering following its extensive overhaul
:On 5 December a power-twin set of vehicles 50933 and 52064 became the first [[Class 108 DMU|DMU]] to operate for two years following bogie repairs, when it operated the Christmas staff train.<ref name="bldec20"/>
:On 9 December a special autotrain ran with [[GWR 1450|1450]] and [[GWR 178 Autotrailer Third]] for several trips between Bridgnorth and Highley for the [[Pull Push Limited|owner]] to mark the end of the locomotive's boiler ticket<ref name="bldec20"/>.
:On 17 December [[4930| 4930 Hagley Hall]]’s boiler arrived back from Northern Steam Engineering following its extensive overhaul.