Changes

Jump to: navigation, search

Severn Valley Railway Timeline 2020-2029

166 bytes added, 22:44, 3 September 2020
2020: info added
:Access to the [[Bewdley South signal box#Signalling_controlled_from_the_Box|large bracket outside of Bewdley South signal box]] was prohibited due to rot, with a temporary replacement prepared<ref>[https://www.svrlive.com/epsep20 Express Points newsletter, September 2020] (Retrieved 29 August 2020)</ref>.
:During a test run on 24th August with [[1501]], a crack was discovered in the right hand return crank. Luckily no further damage was caused.<ref name="blsep20"/>
:Restoration work to repair the brickwork at [[Falling Sands Viaduct]] restarted after the discovery of bats.<ref name="blsep20"/>.
'''September'''
*:On 1 September the PPM50 Parry People Mover (see February) departed on a low loader.:On 4 September the first advertised passenger diesel trains of the decade ran.:On 23 September the film [[Enola Holmes]], filmed partly on the SVR the previous year, was listed for release
==Steam locomotives used==
Trustworthy, administrator
6,720
edits

Navigation menu