Severn Valley Railway Timeline 2020-2029

1,694 bytes added, 13:56, 30 June 2020
2020: info added
:On 15 April [[Ruston and Hornsby 165hp Diesel Shunter D2960|D2960 Silver Spoon]] took [[GWR 9055 Nondescript Saloon]] for a test after overhaul, running within the confines of the section signal at Kidderminster. The line to Bewdley remained severed for the winter works, interrupted by the COVID-19 pandemic.
:The SVR reported an increase in trespassing during the closure.<ref>[https://www.shropshirestar.com/news/local-hubs/bridgnorth/2020/04/29/warning-to-trespassers-on-severn-valley-railway/ Shropshire Star 29 April 2020] (Retrieved 29 April 2020)</ref>
:[[John Leftwich]], interim chairman of the [[Severn Valley Railway Charitable Trust Ltd|SVR Charitable Trust]], died. :On 30 April the renamed Fighting Fight Back Fund total passed £650,000.
'''May 2020'''
:Kidderminster station was lit to honour the NHS during the COVID-19 pandemic.
:On 15 May the second [[Bridgnorth Loco Works#New_boiler_assembly_and_production|Isle of Man boiler]] built at Bridgnorth was despatched following completion and testing.
:Phase 2 of the [[Falling Sands Viaduct]] work commenced on 18 May while the railway was closed to other traffic, involving replacing damaged brickwork and corbelling, and repointing throughout.
:On 28 May 47593 and 47805 delivered nine HST trailers to Kidderminster from Crewe for storage, and moved one stored sleeper out.
 
'''June 2020'''
:By 1 June the Fight Back Fund reached £745,000.
:The Railway was granted by HSBC a £1.5 million loan under the CBILS scheme, which alongside its existing overdraft facility would mean £3 million available. The SVR Charitable Trust applied for a [[:Category:Lottery funding|National Lottery Heritage Fund]] grant to support the reopening of the Railway.
:The Railway detailed remedial work planned for landslips at [[Sterns]] (water managenent and drainage) and [[Alveley Sidings|Alveley woods]] (drainage scheme, soil nailing and partial replacement of the existing ash embankment material)<ref>[https://www.svrlive.com/epjun20 Express Points, June 2020]</ref>.
:On 26 June [[BR Class 33 33108|33108]] took a train of 19 coaches as part of a stock move from Bewdley to Kidderminster, for maintenance and turning and reforming to prepare the sets as all compartment rakes for August reopening. The line had been breached for nearly six months.
==Steam locomotives used==
| style="text-align:right;" |
|
|-
| [[GWR 6960 Raveningham Hall|6960 Raveningham Hall]]
| style="text-align:right;" | X
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| On hire 2020
|-
| [[7714]]
|
|-
| [[GWR 6960 Raveningham Hall|6960 Raveningham HallWD 71516 Welsh Guardsman]] | style="text-align:right;" | X
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| On hire 2020
|-
Trustworthy, administrator
6,649
edits

Navigation menu