Changes

Jump to: navigation, search

Severn Valley Railway Timeline 2020-2029

1 byte removed, 20:11, 30 April 2020
Updated appeal total
:A minimal contract engineering presence saw tests on the [[Bridgnorth Loco Works#New_boiler_assembly_and_production|second of five new boilers for the Isle of Man Railway]].
:On 15 April [[Ruston and Hornsby 165hp Diesel Shunter D2960|D2960 Silver Spoon]] took [[GWR 9055 Nondescript Saloon]] for a test after overhaul, running within the confines of the section signal at Kidderminster. The line to Bewdley remained severed for the winter works, interrupted by the COVID-19 pandemic.
:On 24 April the renamed Fighting Fund total passed £565,000.:The SVR reported an increase in trespassing during the closure.<ref>[https://www.shropshirestar.com/news/local-hubs/bridgnorth/2020/04/29/warning-to-trespassers-on-severn-valley-railway/ Shropshire Star 29 April 2020] (Retrieved 29 April 2020)</ref>:On 30 April the renamed Fighting Fund total passed £650,000
==Steam locomotives used==
Trustworthy, administrator
6,651
edits

Navigation menu