Changes

Jump to: navigation, search

Severn Valley Railway Timeline 2020-2029

312 bytes added, 19:54, 15 April 2020
9055 on trest 15.4.20
:The Coronavirus pandemic lead to further total closures until the end of June and the cancellations of the 1940s weekends.
:A minimal contract engineering presence saw tests on the [[Bridgnorth Loco Works#New_boiler_assembly_and_production|second of five new boilers for the Isle of Man Railway]].
:On 15 April [[Ruston and Hornsby 165hp Diesel Shunter D2960|D2960 Silver Spoon]] took [[GWR 9055 Nondescript Saloon]] for a test after overhaul, running within the confines of the section signal at Kidderminster. The line to Bewdley remained severed for the winter works, interrupted by the COVID-19 pandemic.
 
==Steam locomotives used==
Trustworthy, administrator
6,637
edits

Navigation menu