'''January 2020'''
:Winter works included track relaying to effectively join up the two previous relayings between [[Bewdley Tunnel]] and Falling Sands Viaduct. The opprtunity opportunity was taken to install a new point at [[Foley Park]] as part of a long term plan to develop the area.
:3 January was the 50th anniversary of the final regular timetabled BR passenger services between Bewdley and Hartlebury and Kidderminster.
:A new buffet building was installed at [[Bewdley]].