:Winter works saw track either side of [[Bewdley Tunnel]] being cleaned of badly contaminated ballast; the last part of the remedial work to the embankment slippage around the [[Accommodation bridge near Severn Lodge|County Boundary]] area; the partial rebuilding of the platform face at [[Eardington]]; lining of the loco water tank at [[Kidderminster]], and at the same location swapping the water column adjacent to platform 1 runround from a fixed column to a standard GWR swing arm type. At [[Waterworks Crossing|Waterworks straight]] welding was completed to a position that restored line speed following Winter Works in 2017. Permanent Way work also took place at [[Highley|Highley bank]] and [[Kidderminster Carriage Shed]].<ref>[https://www.svrlive.com/winter-works-2018 SVRLive]</ref>
:On 16 January the [[Severn Valley Railway Charitable Trust Ltd | SVR Charitable Trust]] announced it had reached its appeal target of £10,000 in under a month, for the cost of repairing the vehicles damaged by graffiti in December. A total of £13,000 was raised.
:The railway's published fare structure withdrew discounted fares for Seniors (60+), who instead paid the full adult fare. In addition, it introduced a version of the [[Loyalty Pass | Annual Family Pass]] for single adults.
:On 30 January the polystyrene patterns for the casting of new cylinders for [[GWR 4930 Hagley Hall]] were completed at Premier Patterns following comprehensive design work by Stafford Road Design Ltd.
:The [[Kidderminster Shunter Fund]] transferred [[BR Class 11 12099]] to [[Severn Valley Railway Charitable Trust Ltd | SVR Charitable Trust]].