Changes

Jump to: navigation, search

Severn Valley Railway Timeline 2010-2019

147 bytes added, 15:30, 8 July 2019
m
2019: Details added
:GBRf Class 66 [[Locomotives named after the Severn Valley Railway|66763 Severn Valley Railway]] visited for four days accompanied by [[Other rolling stock visiting the SVR#2019|three GBRf IIA hoppers]]. The special footplate experience trips, in conjunction with another diesel charter, resulted in the introduction of a previously unannounced 'Timetable C'.
:[[Other rolling stock visiting the SVR#2019|18 Osprey flat wagons]] visited the SVR, used to deliver a large quantity of rail.
:[[Nick Ralls]] resigned as General Manager
'''July 2019'''
:On 4 July Bewdley P-Way laid a panel of track at Chateau Impney, Droitwich Spa. [[686 The Lady Armaghdale]] was extricated from [[The Engine House]] by [[BR Class 08 D3201|13201]] and transported from Bridgnorth for display at the Chateau Impney Hill Climb Motorsport event the following weekend
:On 8 July [[BR Class 08 D3022]] departed by road to Bristol, St Phillp's Marsh depot for tyre turning
==Steam locomotives used==
Trustworthy, administrator
6,720
edits

Navigation menu