Changes

Jump to: navigation, search

Severn Valley Railway Timeline 2010-2019

123 bytes added, 11:29, 28 April 2018
Info added
'''April 2010'''
:A Network Rail test train was used to check the full length of the line for track twists and dipped rail joints. Those found were dealt with by the P.W. staff.
:On 24 April DEMU 1001 operated Hastings Diesels Limited’s 'Severn Explorer' railtour from Hastings to [[Bridgnorth]].<ref>[http://www.hastingsdiesels.co.uk/news/articles/2010a04/ Hastings Diesel Limited] (Retrieved 24 April 2018)</ref><br>:On 28 April [[BR Class 08 D3022]] conducted a big shunt at [[The Engine House]] with [[LMS 798 Royal Coach]] being moved in.
'''May 2010'''
Trustworthy, administrator
6,720
edits

Navigation menu