Significant events in the history of the Severn Valley Railway in preservation between 2000 and 2009 are set out below.
 
Significant events in the history of the Severn Valley Railway in preservation between 2000 and 2009 are set out below.
 +
 +
==2001==
 +
 +
==2002==
 +
 +
==2003==
 +
 +
==2004==
 +
 +
==2005==
 +
 +
==2006==
  
 
==2007==
 
==2007==
Line 5: Line 17:
  
 
Although a massive rebuilding exercise began at once<ref name = "SVRWebsite" />, the line did not reopen fully until 21 March 2008. The damage also caused the opening of [[The Engine House]] at Highley, planned for 2007, to be delayed until the following year.
 
Although a massive rebuilding exercise began at once<ref name = "SVRWebsite" />, the line did not reopen fully until 21 March 2008. The damage also caused the opening of [[The Engine House]] at Highley, planned for 2007, to be delayed until the following year.
 +
 +
==2008==
 +
 +
==2009==
 +
 +
  
 
==2015==
 
==2015==
Line 10: Line 28:
  
 
==See also==
 
==See also==
[[The Severn Valley Railway in preservation]]
+
[[The Severn Valley Railway in preservation]]<br>
 +
( [[Severn Valley Railway Timeline 1990-1999 | 1990-1999]] ) ([[Severn Valley Railway Timeline 2010-2019 | 2010 to date]] )
  
 
==Sources==
 
==Sources==
 
SVR News unless otherwise stated.
 
SVR News unless otherwise stated.

Revision as of 16:03, 27 January 2015

Significant events in the history of the Severn Valley Railway in preservation between 2000 and 2009 are set out below.

2001

2002

2003

2004

2005

2006

2007

Freak thunderstorms on 19 June and 20 July 2007 caused massive damage to the SVRSevern Valley Railway. The line was breached in 45 separate locations[1] between Bridgnorth and Northwood Halt, embankments collapsed, cuttings were filled with debris, Highley UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) starting signal slid down the embankment, and much other destruction took place. Only the section between Bewdley and Kidderminster remained relatively unaffected. ( BBC photo )

Although a massive rebuilding exercise began at once[1], the line did not reopen fully until 21 March 2008. The damage also caused the opening of The Engine House at Highley, planned for 2007, to be delayed until the following year.

2008

2009

2015

50th anniverary celebrations

See also

The Severn Valley Railway in preservation
( 1990-1999 ) ( 2010 to date )

Sources

SVRSevern Valley Railway News unless otherwise stated.
  1. 1.0 1.1 SVR Website. Retrieved 24 January 2015.