Difference between revisions of "Severn Valley Railway Timeline 2000-2009"
From SVR Wiki
(→2007) |
m (add links and headings for years) |
||
Line 1: | Line 1: | ||
Significant events in the history of the Severn Valley Railway in preservation between 2000 and 2009 are set out below. | Significant events in the history of the Severn Valley Railway in preservation between 2000 and 2009 are set out below. | ||
+ | |||
+ | ==2001== | ||
+ | |||
+ | ==2002== | ||
+ | |||
+ | ==2003== | ||
+ | |||
+ | ==2004== | ||
+ | |||
+ | ==2005== | ||
+ | |||
+ | ==2006== | ||
==2007== | ==2007== | ||
Line 5: | Line 17: | ||
Although a massive rebuilding exercise began at once<ref name = "SVRWebsite" />, the line did not reopen fully until 21 March 2008. The damage also caused the opening of [[The Engine House]] at Highley, planned for 2007, to be delayed until the following year. | Although a massive rebuilding exercise began at once<ref name = "SVRWebsite" />, the line did not reopen fully until 21 March 2008. The damage also caused the opening of [[The Engine House]] at Highley, planned for 2007, to be delayed until the following year. | ||
+ | |||
+ | ==2008== | ||
+ | |||
+ | ==2009== | ||
+ | |||
+ | |||
==2015== | ==2015== | ||
Line 10: | Line 28: | ||
==See also== | ==See also== | ||
− | [[The Severn Valley Railway in preservation]] | + | [[The Severn Valley Railway in preservation]]<br> |
+ | ( [[Severn Valley Railway Timeline 1990-1999 | 1990-1999]] ) ([[Severn Valley Railway Timeline 2010-2019 | 2010 to date]] ) | ||
==Sources== | ==Sources== | ||
SVR News unless otherwise stated. | SVR News unless otherwise stated. |
Revision as of 16:03, 27 January 2015
Significant events in the history of the Severn Valley Railway in preservation between 2000 and 2009 are set out below.
2001
2002
2003
2004
2005
2006
2007
Freak thunderstorms on 19 June and 20 July 2007 caused massive damage to the SVRSevern Valley Railway. The line was breached in 45 separate locations[1] between Bridgnorth and Northwood Halt, embankments collapsed, cuttings were filled with debris, Highley UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) starting signal slid down the embankment, and much other destruction took place. Only the section between Bewdley and Kidderminster remained relatively unaffected. ( BBC photo )Although a massive rebuilding exercise began at once[1], the line did not reopen fully until 21 March 2008. The damage also caused the opening of The Engine House at Highley, planned for 2007, to be delayed until the following year.
2008
2009
2015
50th anniverary celebrations
See also
The Severn Valley Railway in preservation
( 1990-1999 ) ( 2010 to date )