Severn Valley Railway Timeline 2000-2009

341 bytes added, 21:46, 21 June 2017
2000
'''March 2000''': The ‘Branch Line Weekend’ saw two visitors, South Devon Railway’s GWR 0-4-2T no 1420 with auto coach and Mid Hants Railway’s LMS Ivatt 2-6-2T no 41312.
 
'''April 2000''': The keys to newly completed [[Kidderminster Carriage Shed]] were formally handed to the SVR by the Carillion site manager on 19 April 2000. The same day saw the first rake of carriages propelled onto Road 1.
'''May 2000''': [[GWR 2251 Class 3205 | 3205]] re-visited the Railway, pulling a 30th Anniversary Special on 23 May.
 
'''June 2000''': Laying of track in Kidderminster Carriage Shed by the P-Way staff was completed during the month.
'''Summer 2000''': The railway experienced a succession of boiler failures, decimating the normal working fleet. Even 813 was pressed into service, hauling a number of 4-coach trains. The railway managed (just!) to include steam on every weekend, but the Diesel fleet was heavily used. A number of reasons for the crisis were later identified, including a combination of water quality (despite the use of approved chemical treatment), type of coal used, and methods of firing. The failures had a ‘domino effect’ as remaining locos were used harder, so failing in turn.
'''December 2000''': Concern at the fragile state of the fleet led to BR Standard 9F 92212 arriving on hire for the Santa Services.
 
 