Changes

Jump to: navigation, search

Severn Valley Railway Timeline 1990-1999

480 bytes added, 15:53, 12 March 2020
additional info and history
==1995==
'''Spring 1995''':
:Over the winter ten feet of river bank was washed away at [[Sterns]], triggering further slippage. 3,000 tons of rock was deposited on the river bank as a temporary measure while a geological survey was undertaken.The other major engineering task was the reinforcement and strengthening of the abutments of the [[Underbridge at Hampton Loade]], during which the steelwork was taken to Bridgnorth to be needle gunned and repainted. A limited Sunday-only service operated between Kidderminster and Highley in January, February and March using the [[DMU]] and small tank engines with nearly 4,500 passengers being carried. The main season opened as planned on 1 April.<ref>SVR News 114</ref>
:Bridgnorth District Council announced a plan to build a halt at the Alverly Countryside Park, to be called [[Country Park Halt]]. Construction would take place in late 1995, and the Halt would be open in time for the 1996 season.
Trustworthy, administrator
11,885
edits

Navigation menu