Difference between revisions of "November 21"

From SVR Wiki
Jump to: navigation, search
(add info and references)
Line 1: Line 1:
 
[[File:Kidderminster signal box.jpg |thumb|300px|right| Kidderminster Signal Box]]On {{PAGENAME}} in SVR history.
 
[[File:Kidderminster signal box.jpg |thumb|300px|right| Kidderminster Signal Box]]On {{PAGENAME}} in SVR history.
  
*[[Severn Valley Railway Timeline 1980-1989#1987|1987]] The new [[Kidderminster Station signal box (1987 onwards)| Kidderminster signal box]] was commissioned.<ref>SVR News 87</ref>
+
*[[Severn Valley Railway Timeline 1980-1989#1987|1987]] The new [[Kidderminster Station signal box (1987 onwards)| Kidderminster signal box]] was commissioned, including the first use of a motorised point on the SVR.<ref>SVR News 87</ref><ref>[http://www.svrsig.org.uk/svr/Frame1.htm Kidderminster Signal Box on the SVR Signalling web site]</ref>
 
*[[Severn Valley Railway Timeline 1980-1989#1988|1988]] Work began on the construction of [[Bridgnorth Loco Works#Boiler shop|Bridgnorth Boiler Shop]].<ref>SVR News 90</ref>
 
*[[Severn Valley Railway Timeline 1980-1989#1988|1988]] Work began on the construction of [[Bridgnorth Loco Works#Boiler shop|Bridgnorth Boiler Shop]].<ref>SVR News 90</ref>
 
   
 
   

Revision as of 08:36, 19 March 2018

Kidderminster Signal Box
On November 21 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← November 20 - November 22 →

References

  1. SVRSevern Valley Railway News 87
  2. Kidderminster Signal Box on the SVR Signalling web site
  3. SVRSevern Valley Railway News 90