Difference between revisions of "November 21"
From SVR Wiki
(add info and references) |
|||
Line 1: | Line 1: | ||
[[File:Kidderminster signal box.jpg |thumb|300px|right| Kidderminster Signal Box]]On {{PAGENAME}} in SVR history. | [[File:Kidderminster signal box.jpg |thumb|300px|right| Kidderminster Signal Box]]On {{PAGENAME}} in SVR history. | ||
− | *[[Severn Valley Railway Timeline 1980-1989#1987|1987]] The new [[Kidderminster Station signal box (1987 onwards)| Kidderminster signal box]] was commissioned.<ref>SVR News 87</ref> | + | *[[Severn Valley Railway Timeline 1980-1989#1987|1987]] The new [[Kidderminster Station signal box (1987 onwards)| Kidderminster signal box]] was commissioned, including the first use of a motorised point on the SVR.<ref>SVR News 87</ref><ref>[http://www.svrsig.org.uk/svr/Frame1.htm Kidderminster Signal Box on the SVR Signalling web site]</ref> |
*[[Severn Valley Railway Timeline 1980-1989#1988|1988]] Work began on the construction of [[Bridgnorth Loco Works#Boiler shop|Bridgnorth Boiler Shop]].<ref>SVR News 90</ref> | *[[Severn Valley Railway Timeline 1980-1989#1988|1988]] Work began on the construction of [[Bridgnorth Loco Works#Boiler shop|Bridgnorth Boiler Shop]].<ref>SVR News 90</ref> | ||
Revision as of 08:36, 19 March 2018
On November 21 in SVRSevern Valley Railway history.- 1987 The new Kidderminster signal box was commissioned, including the first use of a motorised point on the SVRSevern Valley Railway.[1][2]
- 1988 Work began on the construction of Bridgnorth Boiler Shop.[3]
See also
On this day in SVRSevern Valley Railway history
References
- ↑ SVRSevern Valley Railway News 87
- ↑ Kidderminster Signal Box on the SVR Signalling web site
- ↑ SVRSevern Valley Railway News 90