March 13

Revision as of 15:12, 4 July 2017 by Robin (talk | contribs) (Created page with "On {{PAGENAME}} in SVR history. *1878 The Divisional Engineer, Wolverhampton reported th...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

On March 13 in SVR history.

  • 1878 The Divisional Engineer, Wolverhampton reported that a portion of the newly constructed arch of Bewdley Tunnel was giving way. The tunnel continued to deteriorate until being fully relined in 1910.
  • 1889 The GWR bought the rights to clay and minerals under the railway at Jackfield, to prevent their extraction damaging the railway.

See also

On this day in SVR history

← March 12 - March 14 →