March 13
On March 13 in SVR history.
- 1878 The Divisional Engineer, Wolverhampton reported that a portion of the newly constructed arch of Bewdley Tunnel was giving way. The tunnel continued to deteriorate until being fully relined in 1910.
- 1889 The GWR bought the rights to clay and minerals under the railway at Jackfield, to prevent their extraction damaging the railway.
See also
On this day in SVR history