On March 1 in SVR history.
- 1954 BR reopened Jackfield Halt at a new location, following the landslip in 1952.[1]
- 1980 The SVR reopened after a four month overhaul of Victoria Bridge.[2]
- 1999 Contractors started inspection and repointing work in Knowlesands Tunnel[3].
See also
On this day in SVR history
References
- ↑ Marshall (1989) p. 109.
- ↑ Marshall (1989) p. 96.
- ↑ SVR News 130