Changes

Jump to: navigation, search

Main Page

No change in size, 15:24, 7 September 2023
m
typo
|+From this week's [[:Category:Featured articles|featured article]]
|
[[<!--IMAGE FILE-->File: GWR_1086_20200912.jpg |thumb|centre|300px|link=<!--PAGE TO LINK TO--> GWR 1086 Full Third| GWR Corridor Third (TK) 1087 1086 is one of four such coaches on the SVR, all of which ended BR service in the Swindon test train which was used for load testing of diesel locomotives. The entire train was acquired for preservation in 1969; 1086 entered service in 1973 and was also used in the SVR's main line rake of coaches in the mid to late 1970s. [[<!--PAGE TO LINK TO--> GWR 1086 Full Third| (Full article...)]]]]
|-
|}
Trustworthy, administrator
11,914
edits

Navigation menu