Changes

Main Page

51 bytes added, 22 April
m
featured article
|+From this week's [[:Category:Featured articles|featured article]]
|
[[<!--IMAGE FILE--> File:Hampton_Loade_20170408Eardington_20180603.jpg |thumb|centre|300px|link=<!--PAGE TO LINK TO--> Hampton Loade Eardington | Hampton Loade station Eardington is situated on Eardington Bank, mid-way between [[Bridgnorth]] and [[Highley]], located close to the [[River Severn]] (Hampton Loade comes from the Saxon word 'lode' meaning ford). On openingIn recent years, rebuilding the station had only a single platform was completed in 2019 and a siding, with a second platform and signal box being added the water tower was dismantled in 1880s2021. During Although the early station no longer features in daily operations, it resumed use during gala events in 2023 more than 40 years of preservation up to 1974, Hampton Loade formed the SVR's southern terminussince regular timetabled trains ceased. [[<!--PAGE TO LINK TO--> Hampton Loade Eardington | (Full article...)]]]]
|-
|}
 
{| class=" wikitable floatright"
|+Schematic Map of the SVR
|-
|<imagemap>
File:MapandlinksMapandlinks2.png|250px
rect 0 13 400 56 [[Bridgnorth]]
rect 0 57 400 101 [[Eardington]]
Unsurprisingly, there are a large number of questions about the SVR, both in pre-preservation days and for a number of historical items since then. Take a visit down to [[Query Corner]] to see if you have a recollection relating to some long forgotten event, or know of a reliable source (maybe an early edition of the [[Severn Valley Railway News | SVR News]]?) that might have the information we need!
 
In addition are a number of [[:Category:Stub articles|stub articles]] requiring further input.
=== Adding to this Wiki ===
Trustworthy, administrator
11,927
edits