Changes

Jump to: navigation, search

Main Page

19 bytes removed, 15:37, 21 October 2019
m
featured article
|+From this week's featured article
|
[[<!--IMAGE FILE--> File:Seacows 20170317Bridgnorth_Bypass_Bridge_20150528.jpg|thumb|centre|300px|link=<!--PAGE TO LINK TO--> BR 'Seacow' 40t Bogie Ballast HoppersBridgnorth Bypass Bridge | As part of Bridgnorth Bypass Bridge was built during the introduction winter of air1982-braked stock for Permanent Way work83. The proposed bypass had always been a concern to the SVR, as its construction would remove the SVR announced embankment south of [[Bridgnorth | Bridgnorth Station]], severing it from the purchase rest of six 'Seacow' 40 ton ballast hoppers in March 2017 for use in the annual track relay and ballasting operationsline. They have a greater capacity than other ballast wagons on The SVR were liable for building the line and fit bridge, but in well with the similarly fitted [[BR 'Rudd' Ballast Wagons | 'Rudd' Ballast Wagons]] and [[BR 'Parr' Bogie Rail Wagons]]event Shropshire County Council agreed to make a substantial contribution towards its cost. [[<!--PAGE TO LINK TO--> BR 'Seacow' 40t Bogie Ballast HoppersBridgnorth Bypass Bridge | (Full article...)]]]]
|-
|}
Trustworthy, administrator
11,885
edits

Navigation menu