Changes

Jump to: navigation, search

Main Page

82 bytes added, 15:37, 21 October 2019
m
featured article
|+From this week's featured article
|
[[<!--IMAGE FILE-->File: 1450_20150320Bridgnorth_Bypass_Bridge_20150528.jpg |thumb|centre|300px|link=<!--PAGE TO LINK TO-->GWR 1450 Bridgnorth Bypass Bridge | 1450 is a GWR Collett 1400 class 0-4Bridgnorth Bypass Bridge was built during the winter of 1982-2T locomotive, designed for work on small branch lines83. It arrived at The proposed bypass had always been a concern to the SVR in 2014 and although not powerful enough to haul service trains, as its construction would remove the embankment south of [[Bridgnorth | Bridgnorth Station]], severing it is regularly used on Footplate Experience dutiesfrom the rest of the line. The SVR were liable for building the bridge, as well as appearing on charters and at galas on but in the SVR and elsewhere. It will be spending summer 2019 on hire event Shropshire County Council agreed to the Didcot Railway Centremake a substantial contribution towards its cost.[[<!--PAGE TO LINK TO-->GWR 1450 Bridgnorth Bypass Bridge | (Full article...)]]]]
|-
|}
 
{| class=" wikitable floatright"
Trustworthy, administrator
11,873
edits

Navigation menu