Loop Line specification and contract

2 bytes added, 18:43, 18 October 2020
m
Proof reading
| || style="text-align:center;" |'''General Specification.'''
|-
| style="vertical-align:top; width: 20%;" | 1. The Contractor to execute all works <br><br><br><br><br><br>To supply all materials &c || The Contractor shall, to the satisfaction of the Engineer in a workmanlike substantial and lasting manner construct and execute all the Works herein mentioned and specified or referred to whether temporary or permanent including all contingent and incidental works and shall construct and execute all the said Worksrespectively as delineated on the Drawings enumerated herein, and in the manner and according to the directions and provisions herein respectively as delineated on the Drawings enumerated herein after mentioned specified or referred to or in any detailed or modified Specifications Drawings Plans Sections or written instructions which may from time to time be given to the Contractors Contractor by the Engineer, and in and for the construction and execution of the said works, the Contractor shall provide and supply all the materials plant articles and things which according to this specification Specification are to be provided by the Contractor or which may be requisite or proper for the due performance of the works and of all the kinds descriptions and qualities specified in or to be inferred from this Specification and the Drawings or from any detailed Specification Plans Drawings Sections or written instructions as aforesaid of the best and most proper kinds or descriptions respectively to the satisfaction of the Engineer, and shall also find and provide all labour tools plant and machinery requisite or proper for the due performance of the work, and in executing the same shall perform fulfil obey and abide by all the directions provisions terms and conditions of this Specification and the Drawings and of any such detailed Specifications and written instructions as aforesaid and shall be subject to the several liabilities and obligations in case of default herein mentioned it being the intention of these Presents that the Contractor shall do execute and provide in accordance with this Specification everything requisite or proper for the entire performance of the said Works.
|-
| style="vertical-align:top;" | 2. Contract includes all materials &c<br><br>Except permanent way<br><br>Time for completion || The Works comprised in the Contract include earth work in every variety of material whether in soft earth or rock, all fences temporary and permanent, all brick, stone, timber and iron -work and all work materials material and labour of every description necessary for the constructions construction and completion of the respective Railways up to the formation level, ; the providing and laying thereon of the ballast and also the laying of the permanent way (the materials of which are provided by the Company) and the delivery of the whole of the said works in a complete and perfect condition to the Company on or before the 31st day of October 1875.
|-
| style="vertical-align:top;" | 3. Contractor not to interfere with conveniences of the adjoining properties &c || The Contractor shall not in carrying out the works interfere with the free and uninterrupted use by the respective Proprietors of any of the Railways, Canals, Watercourses, Roads or other conveniences adjoining or near the new Railway , and shall perform all temporary or permanent works, such as alterations, diversions or substitutions which may be necessary to secure the same.
|-
| style="vertical-align:top;" | 5. “Engineer” || Whenever the word "Engineer" occurs herein it shall be taken as meaning Edward Wilson<ref group="note">GWR Engineer Edward Wilson was previously Locomotive and Permanent Way Engineer for the [[Oxford Worcester and Wolverhampton Railway]] and later the [[West Midland Railway]]. He died on 26 August 1877; resident Engineer Mr Tyrell saw the project through to completion.</ref> of 9 . Deans Yard Westminster or in case of his death incapacity or removal the Engineer in Chief for the time being of the Company.
|-
| style="vertical-align:top;" | 6. “Contractor” || The word "Contractor" shall be taken to apply equally to all and each of the Partners of a firm (if any) entering into a contract with the said Company or to any single individual making such Contract.
|-
| style="vertical-align:top;" | 7. “Authority” || “Authority” or “orders in writing” , and all expressions to that effect , shall apply to any printed or written Documents signed by the Secretary or Engineer of the Company whether such documents be letters notices drawings or sketches.
|-
| style="vertical-align:top;" | 8. Company to deliver lands to Contractor || The Company will from time to time deliver to the Contractor so much of the lands Lands required for the works as shall in the opinion of Engineer be sufficient for the commencement by the Contractor of such work works respectively and will from time to time deliver to the Contractor possession of the residue of the land Land required in such pieces or parcels as the Engineer may think proper and sufficient for the due completion of the said works within the period to which the Contractor is limited by the Contract.