Changes

Jump to: navigation, search

Loop Line specification and contract

323 bytes added, 11:13, 13 October 2020
add links
|-
| style="vertical-align:top;" | 22. ||
Nº 1 General Plan of Railway<ref group="note">The mileages shown in the Specification were measured from Bewdley South junction towards Kidderminster.</ref><br>
&nbsp;“ &nbsp; 2 Longitudinal Section of Railway<br>
&nbsp;“ &nbsp; 3 Cross Sections (Sheet 1)<br>
&nbsp;“ &nbsp; 4 Cross Sections of Railway Cuttings + Embankments and Road approaches<br>
&nbsp;“ &nbsp; 5 Gates and Fencing<br>
&nbsp;“ &nbsp; 6 [[Devil's Spittleful (Rifle Range) Bridge|Bridge at 0m 46.88 ]]<br>&nbsp;“ &nbsp; 7 [[Bewdley Tunnel|Tunnel from 1m 4 Ch<span style="vertical-align:super;font-size:small">s</span> to 1m 26 ]] <br>&nbsp;“ &nbsp; 8 [[Stourport Road Bridge|Bridge at 1m 61.15 ]] <br>&nbsp;“ &nbsp; 9 [[Underbridge off Lisle Avenue|Bridge at 1m 7 Ch<span style="vertical-align:super;font-size:small">s</span> and Culverts]]<br>&nbsp;“ &nbsp; 10 [[Falling Sands Viaduct|Viaduct from 2m 11.63 Ch<span style="vertical-align:super;font-size:small">s</span> to 2m 17.72 ]] <br>&nbsp;“ &nbsp; 11 [[Worcester Road Bridge|Bridge at 2m 26.72 ]] <br>&nbsp;“ &nbsp; 12 [[Hoo Road Bridge|Bridge at 2m 46.30 ]] <br>
&nbsp;“ &nbsp; 13 Division at River Stour and Canal
 
Trustworthy, administrator
11,876
edits

Navigation menu