Changes

Jump to: navigation, search

Level crossing at Hill Farm, Northwood Lane

117 bytes added, 17:04, 15 February 2016
Crossing relaid in 2004
Despite these measures, in [[Severn Valley Railway Timeline 2000-2009 | November 2000]] the crossing was the site of a collision between 8F 48773 and a van. HM Railway Inspectorate later confirmed that the Railway was not at fault.
The original timber crossing was replaced with a ‘Holfast’ prefabricated crossing in 2004.<ref>SVR News 147</ref>
==Sources==
<references />
Trustworthy, administrator
11,878
edits

Navigation menu