LNER 24105 Open Third

29 bytes removed, 15:24, 20 October 2017
2017 overhaul: completed
===2017 overhaul===
A major overhaul commenced on 3 January 2017 and is expected to take 8 months. Roof board refastening has meant a complete strip-down followed by rebuilding with new canvass (fitted 4 July 2017), rainstrips and tacking covers. Also completed is was the obligatory window re-sealing with new retaining beading and fresh sealent. A section of frame was found to be rotten due to a leaking window seal and this, together with some panels have been repaired. The old varnish was removed, the woodwork restored to its original colour, sanded, linseed oiled and varnished; lining and signwriting were underway {{As of|2017|07|lc=y}}completed. Internally the lighting has been was improved with LED bulbs and reproduction LNER wall lamps whilst the Rexine was either cleaned or where necessary, replaced. The rather tired tables recieved received a re-varnish and were covered in linoleum in lieu of the old Rexine. New seat frames and ends have been were constructed, and the seats and backs re-covered in reproduction LNER fawn patterned moquette to bring it up to standard. The toilet is to be was remodeled to improve its ambiance, increase available space, and simplify the plumbing. The overhaul was completed in October 2017.
<gallery>
Trustworthy, administrator
11,918
edits

Navigation menu