Changes

Jump to: navigation, search

LNER 24105 Open Third

2 bytes removed, 14:21, 7 April 2017
m
2017 overhaul: ate format
===2017 overhaul===
A major overhaul commenced on 3rd 3 January 2017 and is expected to take 6 months. Roof board refastening has meant a complete strip-down which will be followed by rebuilding with new canvass, rainstrips and tacking covers. Also underway is the obligatory window re-sealing. A section of frame was found to be rotten due to a leaking window seal and this frame, together with some panels have been repaired. Most of the old varnish has been removed, the woodwork restored to its original colour and sanded, prior to re-varnishing, lining and lettering of the exterior. Internally there will be lighting improvements (including reproduction LNER wall lamps), cleaning and patch replacement of Rexine and refurbishing of the now rather tired tables and seating. New seat frames and ends have been constructed to bring the latter up to standard. The toilet is to be remodeled to improve its ambiance, increase available space, and simplify the plumbing.
<gallery>
Trustworthy, administrator
6,720
edits

Navigation menu