Changes

Jump to: navigation, search

LMS Corridor Third 2300

5,868 bytes added, 19:44, 16 November 2020
m
Typo, tidy up/consistency check on capitals, hyphens etc., links added
{{Infobox maroon carriage|image = LMS_2300_20150322.jpg|caption = LMS Corridor Third 2300|construc = LMS Derby|status = In service|carno = 2300|othernos = SC2300M, W2300M|designed = WM Stanier / HG Ivatt|diagram = 2119|lot = 1407|cartype = [[:Category:BR Carriage classification codes#LMS Codes|CF]], [[File:LMS_2300_20150322.jpg Category: Carriage Type TK|TK]]|length = 57ft|weight = 31T|seats = 42 third|built = 1946|years1 = 1966|events1 = Withdrawn|years2 = 1978|events2 = Arrived on SVR|years3 = 1984|events3 = Entered SVR service|years4 = |events4 = |thumbyears5 = |300pxevents5 = |rightyears6 = | events6 = }}Although the LMS was active in building Open carriages following the appointment of W A (later Sir William) Stanier as CME, they continued to build some Corridor Thirds (LMS: CF, BR: TK) at the same time. '''LMS Corridor Third 2300]]''' was a Stanier design although by the time it was built in 1946, Stanier had been succeeded as CME by Charles Fairburn in 1944 and then H G Ivatt in 1946. Weighing 31 tons and with a 57ft length, the coach provides seating for 42 third class passengers in seven third class compartments plus two toilets, one at each end of the side corridor. Post-war design modifications saw the introduction of an all-welded roof and the provision of four external doors rather than two on the corridor side<ref>SVR Stock Book Ninth Edition</ref>.
Although the LMS was active ==2300 in building Open carriages following the appointment of W A (later Sir William) Stanier as CME, they continued to build some Corridor Thirds at the same time. LMS Corridor Third (TK) service==2300 was a Stanier design, although by the time it was built at Derby in 1946 H G Ivatt had become the CME of the LMS. It was built at Derby to diagram number 2119 , lot number 1407. <ref>[[Bibliography#Other References|Jenkinson & Essery (1977)]] p. 109.</ref> After nationalisation it initially carried the number SC2300M, the prefix indicating a carriage allocated to BR's Scottish Region and the suffix denoting its LMS origin. It features seven third class compartmentswas later renumbered W2300M after being transferred to BR's Western Region, and two lavatories, with a side corridorwas withdrawn from BR service in January 1966<ref>[[Bibliography#Other References|Longworth Vol. 2 (2019)]] p.299. One post-war modification saw the introduction of an all-welded roof</ref>.
==2300 in preservation== 2300 was originally purchased for the SVR in February 1978 acquired by a member of the [[L.M.S. & B.R. Coach Department Sales Coach | LMS & BR Coach Fund]]. It arrived on the SVR as an empty shell from Bass Charrington in Plymouthwhere, after being internally stripped, where it had been was used for the next 11 years as a store room by the barrel-making department. In a sixmid-year restoration 1977 it was fitted out with an interior salvaged from coach 13045 which was scrappedidentified as a candidate for acquisition by the SVR. After a period of use At the time it was repainted in appeared virtually complete externally with the then new Kidderminster paint-shop during 1997. The LMS & BR Coach Fund donated all its vehicles to [[Severn Valley Railway Charitable Trust Ltd | The SVR Charitable Trust]] bodywork in 2007good condition, following which 2300 received although a further repaint decision had yet to be taken on whether the carriage would ultimately be restored or stripped for parts for use in 2008the SVR's other LMS carriages.<ref>SVR News 35</ref>
2300 is regularly used arrived on the SVR on 9 February 1978 as an empty shell having been donated by Bass Charrington; its owner on the SVR was subsequently recorded as a member of the [[L.M.S. & B.R. Coach Department Sales Coach | LMS & BR Coach Fund]].<ref>SVR Stock Book Eighth Edition</ref> By late 1978 restoration at Bridgnorth was due to begin in earnest using the internal panelling from BRCW-built [[Carriages formerly resident on the SVR #Carriages scrapped while at the SVR| LMS Maroon set (Sel L)Corridor Third 13045]] whose bodywork was badly corroded and was later cut up.<ref>SVR News 50</ref>
==Sources==By June 1980 the partitions from 13045 had been installed and the windows re-bedded along one side, while work on stripping and priming the roof had begun. Work then stopped for three months while 13045 received attention. After resuming, the carriage was rewired with the work funded by the LMS Coach Fund.<ref>SVR News 59</ref> By summer 1983 the carriage was mounted on a new set of bogies, with 2300's bogies destined for [[LMS 27218 Third Open|27218]] after refurbishment.<ref>SVR News 68</ref>  Railway Heritage Register The five-year plus restoration was finally completed when 2300 entered traffic on the 2.30 p.m. train ex [[Bridgnorth]] on Sunday 21 July 1984. As well as being one of the most comprehensive rebuilds undertaken at the time, it was also largely responsible for establishing the [[Carriage SurveyRepair Works#Other_facilities|Bridgnorth C&W]] team, which began with five people at its start and had become a close team of around thirty by late 1983.<ref>SVR News 70, 73</ref> By 1989 the carriage was still in good condition. The roof received attention to ensure it remained watertight, and later in the same year the carriage was repainted.<ref>SVR News 92,94<br/refDuring 1992 the LMS set was in limited use. After assessment of the whole set, 2300's bogies were found to be in the worst condition and the carriage was transferred onto a newly refurbished set originally intended for 12992.<ref>SVR Stock Book Ninth EditionNews 102</ref> In spring 1997 the LMS set received attention to its upholstery. 2300 was re-upholstered with original LMS seats which had been in store at [[Carriage Repair Works#Kidderminster_Carriage_Repair_Works|Kidderminster Carriage Repair Works]]. Most of the set also required repairs and repainting. 2300 underwent a ten week overhaul which involved a number of repairs including replacing a ten foot rotten strip of ash wood under one end of the roof, half of the floor in one vestibule and two step boards. The door locks were all removed and renovated. Finally 2300 became the first carriage to be repainted in the newly opened [[Carriage Repair Works|Kidderminster Carriage Works paint shop]].<ref>SVR News 122, 124<br/ref>  In September 2002 2300 underwent a three week overhaul. Some 1200 external screws (mostly 1946 originals) were changed as they were coming loose and allowing the curved steel skin to return to a straight steel sheet. The windows were also re-bedded, having last been done during restoration. Frost-damaged plumbing in one lavatory was re-instated and some collapsed seat rails were reinforced. 2300 was not required on that year's [[Christmas services]] so spent the winter in the [[Kidderminster Carriage Shed|Carriage Shed]] where the opportunity was taken to replace a ripped gangway bellows.<ref>SVR News 139</ref> In 2007 the LMS & BR Coach Fund donated all its vehicles to the then [[Severn Valley Railway Charitable Trust Trust Ltd | SVR Rolling Stock Trust]]. The LMS set was in the course of overhaul and repainting, with 12992 completed at [[Carriage Repair Works#Bewdley_Carriage_and_Wagon_Department|Bewdley Carriage and Wagon Department]] and 149 and 27220 at Kidderminster, when the June [[2007 Storm Damage]] closed the line. The LMS set was trapped at Bridgnorth where it remained in the open for the next nine months. When the railway reopened on Good Friday 2008, the set returned to Kidderminster Carriage Shed. 2300 was found to have the floor of its battery box collapsed which was stripped out and rebuilt.<ref>SVR News 161</ref> The overhauls resumed with 27270 in mid-2008. 2300's overhaul finally began in September 2008. A section of roof gutter was taken down to allow seven patches to be welded in. The seat bases were reversed to even out wear and extend their life. The ceilings were sugar-soaped and repainted, while all of the veneered walls re-varnished. Ten panels of veneer-faced plywood in the corridor were renewed, the old ones having delaminated due to damp incurred at Charrington's Brewery. One gangway also had its canvas bellow renewed. 2300 was fully repainted and returned to traffic in time to take part in the 2008 Christmas services.<ref>SVR News 164</ref> 2300 is regularly used in the [[Carriages#Set_L|the LMS Maroon set (Set L)]]. ==See also==*[[Carriages| List of carriages]] ==References==<references />
==Links==
*[http://www.cs.vintagecarriagestrustrhrp.org.uk/se/CarriageInfo.asp?Ref=660 2300 on vintagecarriagestrust.orgRailway Heritage Register On-Line]<br>*[httphttps://www.svrtrust.org.uk/our-vehicles/lms/2300-2index.html php?page=Corridor%20Third%20No%202300 2300 on svrtrust.org.uk]
==See also==[[Carriages| List of carriages]]<br>: [[LMS 798 Royal Coach | Previous ]]<br>: [[LMS 2886 Six-wheel Passenger Brake (later 32919) | Next ]]{{CarriageNavbox}}
[[Category: Rolling stock owned by The SVR Charitable Trust]]
[[Category: Carriage Type TK]] [[Category:Featured articles]]
Trustworthy, administrator
6,651
edits

Navigation menu