Changes

Jump to: navigation, search

July 22

299 bytes added, 15:35, 22 July 2019
fallen tree / revised service
*[[Severn Valley Railway Timeline 1990-1999#1994|1994]] The new [[Bridgnorth#Footbridge outside Bridgnorth Station|footbridge outside Bridgnorth Station]] was opened to the public.<ref>SVR News 114</ref>
*2001 The [[Hampton Loade|Hampton Loade Station]] Gala featured the SVR's first National Velocipede Rally<ref>SVR News 139</ref>.
*2019 Due to a fallen tree on the line between [[Highley]] and [[Hampton Loade]], trains ran between [[Kidderminster]] and Highley only with a vintage bus service operating between [[Arley]] and Bridgnorth<ref>[https://www.svr.co.uk/NewsItem.aspx?a=890 SVR Website] (retrieved 22 July 2019)</ref>.
==See also==
Trustworthy, administrator
11,900
edits

Navigation menu