Changes

Jump to: navigation, search

January 18

73 bytes added, 18:41, 4 January 2020
m
Info added
*2011 Major engineering work was in progress at [[Arley]] during the winter shut-down. This included the removal and rebuilding of platform surfaces and unstable platform walls and the installation of new drainage beneath the track.<ref>SVR News 172/173</ref> Photos of work in progress on the 18th may be found in [http://www.sharpos-world.co.uk/blog/?p=6334 "Sharpo's Blog].
*2019 [[BR Class 09 09107]] carried out its first shunt in preservation.
==See also==
Trustworthy, administrator
6,717
edits

Navigation menu