Changes

Jump to: navigation, search

Jackfield Halt

357 bytes added, 17:29, 15 November 2016
m
History since
==Jackfield Halt==
Jackfield Halt opened in December 1934, one of a number of halts opened around that time in a bid to attract more local custom to the line. It consisted of a simple wooden platform with a small wooden shelter, and was situated to the west (north in the direction of travel) of the nearby sidings of the [[Maw and Co's Siding | Maw & Company]] tile works (now the site of the Jackfield Tile MuseumMaws Craft Centre). The location, approximately mid-way between [[Coalport]] and [[Ironbridge and Broseley | Ironbridge]], was adjacent to the level crossing for the road which served the area of the nearby village known as Salthouses.<ref name = "Stretton">[[Bibliography#Books | Stretton (2010), p. 97.]]</ref>
The original halt was situated on the Doughty Fault<ref>[[Bibliography#Books | Vanns (1998)]] p.46.</ref> on an area of unstable ground, made worse by the history of clay mining in the area. This caused a number of problems over the years, culminating in a major landslide in spring 1952 when the line and halt slumped 25ft towards the river; many houses in the area were also destroyed. Following this, the halt platform and shelter were relocated by around &frac14; mile to a position east of the sidings (south in the direction of travel), re-opening on 1 March 1954.<ref name = "Marshall">[[Bibliography#Books | Marshall (1989), p. 109.]]</ref> Thereafter the area remained subject to further subsidence, requiring regular re-alignment and re-ballasting of the line which was subject to a 5 m.p.h. restriction.<ref name = "Stretton" />
The halt remained in use until the closure of the line to passengers on 9 September 1963.  ==History of the area since closure==Ongoing subsidence later resulted in the adjacent road being closed and rebuilt on the old track bed, although this was in turn subject to further collapse.<ref name = "Marshall" /> In 2013 Telford & Wrekin Council began a three year project for a stabilisation scheme at Jackfield, for which the main works were completed in October 2016.<ref>[http://www.telford.gov.uk/jackfieldstabilisationproject Telford and Wrekin Council]</ref>
==See also==
==Links==
[http://www.britishpathe.com/search/query/jackfield Viewable British Pathe Newsreels of the 1952 landslide ]<br>[http://www.mawscraftcentre.co.uk/ Maws Craft Centre website]
[[Category:Featured articles]]
Trustworthy, administrator
11,919
edits

Navigation menu