Changes

Jump to: navigation, search

Jackfield Halt

2 bytes added, 16:48, 29 May 2017
m
accurate date
==Jackfield Halt==
Jackfield Halt opened in on 3 December 1934, one of a number of halts opened around that time in a bid to attract more local custom to the line. It consisted of a simple wooden platform with a small wooden shelter, and was situated to the west (north in the direction of travel) of the nearby sidings of the [[Maw and Co's Siding | Maw & Company]] tile works (now the site of the Maws Craft Centre). The location, approximately mid-way between [[Coalport]] and [[Ironbridge and Broseley | Ironbridge]], was adjacent to the level crossing for the road which served the area of the nearby village known as Salthouses.<ref name = "Stretton">[[Bibliography#Books | Stretton (2010), p. 97.]]</ref>
The original halt was situated on the Doughty Fault<ref>[[Bibliography#Books | Vanns (1998)]] p.46.</ref> on an area of unstable ground, made worse by the history of clay mining in the area. This caused a number of problems over the years, culminating in a major landslide in spring 1952 when the line and halt slumped 25ft towards the river; many houses in the area were also destroyed. Following this, the halt platform and shelter were relocated by around &frac14; mile to a position east of the sidings (south in the direction of travel), re-opening on 1 March 1954.<ref name = "Marshall">[[Bibliography#Books | Marshall (1989), p. 109.]]</ref> Thereafter the area remained subject to further subsidence, requiring regular re-alignment and re-ballasting of the line which was subject to a 5 m.p.h. restriction.<ref name = "Stretton" />
Trustworthy, administrator
11,907
edits

Navigation menu