Changes

Jump to: navigation, search

Highley

75 bytes added, 15:49, 23 December 2015
Date crane was erected
===Crane===
A (non-operational) hand powered crane is located on a small platform in the goods yard. The winding gear appears identical to that on the wooden crane in [[Bewdley Goods Shed]]. The refurbished crane was erected in August 1992<ref>SVR News 105</ref>.
<gallery>
File:HighleyCrane.jpg | The crane at Highley
Trustworthy, administrator
11,914
edits

Navigation menu