Changes

Jump to: navigation, search

Hampton Loade signal box

169 bytes added, 16:49, 19 April 2019
Info added
On the closure of the line in 1963, the box was largely dismantled, with parts reportedly being used to build a chicken coop in the garden of the station house. The box was rebuilt, starting in 1971, using parts from the original box and that at Stourport, incorporating the lever frame from Ledbury North End. Having been built around the original frame of the building, it is a facsimile of the original box. The new box and signalling was recommissioned on 19 May 1973, initially working to Bridgnorth using One Engine in Steam, and then [[Single line working using tokens|Electric Token Block]] a few weeks later after the commissioning of the token instruments. The ETT section to Highley was signed into use on 2 March 1974, with the token releasing Alveley South ground frame.
The box gained the ability to switch out by Whitsun in 1975, and the down and up distants were brought into use in 1981 and 1982. Several overhauls of the box equipment have been carried out, including point rodding in 1982, rewiring in 1983, the mechanical interlocking in 1992, and a second rewiring in 2012/2013. The latter was done in conjunction with the resiting of the token instruments, which had previously been sited on the brick support for the fireplace, which was not rebuilt in 1973. A replacement fireplace and chimney were brought into use on 27 December 2014.Refurbishment in 2019 saw new steps made in the correct style, new shiplap boarding and new windows for the locking room.<ref>Hampton Loade Facebook 18 April 2019</ref>
== Operation and Equipment ==
All signals are of late GWR/BR(W) steel tubular post and enamel arm design. Signal 16, the Down Distant, is motor worked.
== See Also also ==
* [[List of signal boxes]]
Trustworthy, administrator
6,720
edits

Navigation menu