Changes

Jump to: navigation, search

Hampton Loade

201 bytes removed, 17:45, 19 June 2015
remove text now shown in box
|-
|}
Hampton Loade station has two platforms and a [[Hampton Loade signal box|signal box]], allowing trains travelling in opposite directions to pass. The next stations in the Up direction towards [[Kidderminster]] are [[Country Park Halt]] and then [[Highley]], and the next station in the Down direction is [[Bridgnorth]], where the line terminates.
During the early years of SVR operation (early 1970s) Hampton Loade formed the southern terminus. Evidence of this remains in the form of the presence of the down starting signal on platform 2, which is normally only used for up trains.
Trustworthy, administrator
11,919
edits

Navigation menu