Changes

Jump to: navigation, search

Hampton Loade

21 bytes added, 13:32, 4 June 2017
m
add links
*1862: Hampton Loade station opened with the rest of the Severn Valley Line on 1 February, with a single platform on the west side of the line and a short siding opposite. There was no facility for crossing trains.
*1882-1883: Approval was given for construction of the up platform and provision of the passing loop and an additional siding, controlled by a newly-installed signal box. The Board of Trade approved these works in June 1883<ref name = MarshallP101" />.
*1930s: Hampton Loade was the site of a [[Arley Camp Coach|GWR camping coach ]] pre-World War 2<ref name = MarshallP101" />.
*1963: Through passenger services ceased on 9 September, with through freight services ending at the end of November.
Trustworthy, administrator
11,897
edits

Navigation menu