Changes

Jump to: navigation, search

GWR Large Prairie 4150

402 bytes added, 16:02, 28 July 2018
Info added
===The boiler===
A full report in 2008 from the SVR's boiler foreman showed the boiler to be in good condition, having been fitted with a new inner firebox at its last overhaul. It was expected to require the standard repairs: new flues, tubes, steel stays replaced, crown stays replaced, foundation ring removed to check for grooving and replaced, welding repairs to front tube plate and possible boiler barrel patch. A record net total of almost £16,000 from the annual [[Severn Valley Railway Association]] raffle proceeds were allocated to 4150 in 2008, which was ring-fenced for spending on the boiler.<ref>[http://www.4150.org.uk/4150_new-beginning.html 4150 Fund website] (Retrieved 20 January 2018)</ref>
By November 2016 the Fund had received confirmation that 4150 had a slot in the Bridgnorth Boiler Shop in the last quarter of 2017.<ref>4150 Fund Newsletter 2017, January 2017</ref> The Fund intended it to go to Bridgnorth in November 2017 for overhaul and in March 2017 it was lifted onto [[GWR 40554 Chaired Sleeper Wagon|wagon 40554]] for preparation work to begin.<ref>[http://www.svr.co.uk/pdf/Special%20Events/SVR%20Peep%20Behind%20the%20Scenes%202017.pdf Peep Behind The Scenes leaflet July 2017]</ref>
Trustworthy, administrator
6,717
edits

Navigation menu