Changes

Jump to: navigation, search

GWR 1116 Full Third

No change in size, 15:00, 21 July 2015
m
format
[[File:GWR C77 TK 1116 at Bridgnorth.jpg|thumb|200px300px|right|GWR 1116 Full Third]]
1116 is one of four 1938-built Collett Corridor Third (TK) coaches on the SVR, along with [[GWR 1086 Full Third |1086]], [[GWR 1087 Full Third |1087]] and [[GWR 1146 Full Third |1146]]. They were built at Swindon to diagram number C77 as lot number 1593.
Trustworthy, administrator
11,914
edits

Navigation menu