The area includes the [[Safari Park#Possible_future_station|site of a possible future station]] serving the [[Safari Park]] and developments of the Sugar works site, and mooted from time-to-time for an extension of mainline services.
It also includes the site of the proposed [[Wagon Review Group|Wagon shed]].In winter 2019-20 the opportunity was taken to install a set of points at Foley Park for future use with a siding or carriage shed.<gallery mode=packed heights=200px style="text-align:left">Foley_Park_Points_20200912.jpg|The new points at Foley Park. The [[Underbridge off Lisle Avenue]] is just beyond the points with [[Falling Sands Viaduct]] in the distance.</gallery>
==See also==