Changes

Jump to: navigation, search

February 9

261 bytes added, 17:22, 5 February 2018
no edit summary
*1947 In bitter winter conditions, 0-6-0T No 2612 fitted with a large snow plough was seen departing Kidderminster towards Bewdley.<ref>[[Bibliography#Books|Turley (2005)]] p. 15.</ref>
*[[Severn Valley Railway Timeline 1980-1989#1983 | 1983]] The concrete deck of the new [[Bridgnorth Bypass Bridge]] was poured.<ref>SVR News 67</ref>*[[Severn Valley Railway Timeline 2000-2009#2008 | 2008]] Following the [[2007 Storm Damage|2007 storm damage]], the first section of line between Bridgnorth and Hampton Loade reopened for passenger services<ref>[[Bibliography#Books|Sowden (2012)]] p.44.</ref>.
==See also==
==References==
<references />
 
[[Category:On this day in February | February 09]]
Trustworthy, administrator
11,918
edits

Navigation menu