Changes

Jump to: navigation, search

Eardington

120 bytes removed, 12:00, 22 September 2023
m
Typo
Restoration by a "small group of Bridgnorth C&W volunteers" started in 1989.<ref>SVR News 100 p.35, SVR News 127 p.45</ref> By summer 1990, Steve Downs was "unofficial stationmaster".<ref>SVR News 100, p.31</ref> It was gradually cosmetically restored by the Friends and occasionally opened to visitors on certain special events, albeit with trains not stopping, from the [[Step Back to the 1940s|War Weekend]] of 25/26 June 1994 onwards.<ref>SVR News 111 p.36</ref>
On 2-3 June 2018 it staged "'''Eardington 150'''" to mark its 150th birthday. The station was open to the public on both days with various special attractions (trains did not stop). The event coincided with the SVR's Goods Gala.<ref>[https://www.shropshirestar.com/entertainment/attractions/2018/06/04/restored-shropshire-railway-station-celebrates-150-years---with-video-and-pictures/ SVR's PR on Shropshire Live website 4 June 2018] (Retrieved 24 June 2018)</ref>.
===The platform===
By 1989 platform coping at the southern end of the platform, adjacent to station building, had been removed after it collapsed. A shortened platform, 152 feet long, remained at northern end.<ref>SVR News 92 p.2, SVR News 100 p.35, SVR News 109 p.19, SVR News 122 p.44, SVR News 127 p.45, SVR News 192 p. 30</ref> The Friends held a fundraising appeal in 2014 to replace the missing part;<ref>SVRA Working Members Newsletter November 2014</ref> it was reported on 27 October 2016 that sufficient funds had been raised to purchase the required replacement GWR bricks.<ref>[https://twitter.com/Eardingtonstn/status/791730973977219072 Eardington Station Twitter Feed], retrieved 1 November 2016</ref>
A project commenced during the January 2018 winter shutdown involving the partial rebuilding of the platform face.<ref>[https://svrtrust.org.uk/downloads/Platform%202018%20web%20version-1.pdf 'Platform' magazine, 2018 Issue 4, p.5]</ref> Some 8000 engineering bricks recovered from the London – Bristol mainline and donated by Kier Construction have been used. These have been were cleaned up by the Friends of Eardington Station over a period of time , and provide a genuine connection to the GWR. The rebuild was undertaken by JSR Construction who are based less than a mile away from the stationof Chelmarsh, thus keeping the work local.<ref>[https://www.svrlive.com/eardington-station SVRLive 'Eardington Station' 13 January 2018]</ref><ref>[https://www.svrlive.com/winter-works-2018 'SVRLive Winter Works 2018' 16 January 2018]</ref> Work was completed on 31 January 2019, giving the station a full length working platform of 300' - roughly 5 coaches - for the first time since 1984. The £41,000 project was aided by donations from the [[Severn Valley Railway Charitable Trust Ltd| Charitable Trust]] and [[Severn Valley Railway Company Limited| the Guarantee Company]] of £6,500 each, with the remainder being raised by the Friends. The project was completed on time and on budget. <ref>[https://www.svrlive.com/eardington-station SVR Live February 2019]</ref><ref>[https://www.shropshirestar.com/entertainment/bridgnorth-entertainment/2019/03/01/volunteers-on-severn-valley-railway-proud-to-unveil-new-platform/ Smith, R., 'Severn Valley Railway volunteers proud to unveil new platform', Shropshire Star, 1 March 2019] (Retrieved 3 March 2019)</ref> The rebuilt platform, which incidentally is longer than those at [[Highley]], Hampton Loade and Bridgnorth’s platform 2, can be seen in the main photograph taken during the 2018 Goods Gala. It greatly improved the appearance of the station and progressed its potential use on future gala events.
==Restored for passenger use==
=== From 2023 ===
By 2023 ORR had given the SVR permission in principle to stop trains there during Galas. The Railway put in place the paperwork and procedures to enable this, as it had not been operational for many years, for the [[Autumn Steam Gala]].<ref>[https://news.railbusinessdaily.com/vulcan-joins-svr-gala-line-up-and-eardington-welcomes-first-arrivals-in-41-years/ Longhorn, Danny, ' 'Vulcan' joins SVR Gala line-up, and Eardington welcomes first arrivals in 41 years', Rail Business Daily, 21 July 2023] (Retrieved 25 July 2023)</ref> For safety reasons, only local trains consisting of a few carriages are able to not longer than the station platform may stopthere, because and not during hours of the short station platformdarkness.
==Proposed reopening==
Opposite the station platform is a dead-end siding which is accessed by a two-lever [[Eardington ground frame | ground frame]] at the south end. This is released by the [[Highley signal box|Highley]]-[[Bridgnorth signal box|Bridgnorth]] long section token, and was commissioned in 1976.<ref>[http://svrsig.co.uk/svr/Frame8.htm Severn Valley Railway S&T Department (unofficial) website.]</ref>
The original siding at Eardington had been removed by BR in 1964 after closure of the line, but was reinstated in the early days of the SVR. In summer 1972 under Sir Gerald Nabarro's chairmanship, contractors began work to convert the siding into a passing loop at the then not insignificant cost of £8,000.<ref group="note">£8,000 in 1972 equates to around £135,000 in 2023. For context, the whole section of the railway between Bridgnorth and Alveley had cost only £25,000 just two years earlier.</ref> The loop was intended to accommodate a locomotive and 10 coaches, with a new concrete block-faced platform being built incorporating the cattle dock at the south end. A small signal box on the site of the cattle dock was to be added later. These works would have occupied most of the then car park area, so the small field above the station building was partially levelledto form a new car park which would have been accessed from the road at the north end.<ref name=SVR25/> Later that year, during preparation for commissioning the signalling between Bridgnorth and Hampton Loade, an extra token machine was installed in [[Bridgnorth signal box]] to cater for the Eardington loop.<ref>SVR News 26, ''Signal & Telecommunications Department Notes''</ref>
The installation of the passing loop was seen as part of a plan by Sir Gerald Nabarro to abandon Bridgnorth,<ref group="note">Although officially described as a passing loop, discontented members believed it was actually intended as a run round loop at what would become the northern terminus following the closure of Bridgnorth.</ref> which led to much unrest on the SVR at the time. In fact the connection at the north end would have been too tight for most locomotives.<ref name=Marshall180/> However by May 1973 Sir Gerald Nabarro had stepped down from the SVR(H) and Guarantee Company Boards. An EGM was held that month to consider the impact of the proposed [[Bridgnorth Bypass Bridge|Bridgnorth bypass]]. [[Richard Dunn]] advised shareholders and members via SVR News that "''I have no reason to reverse my opinion of 1968 that Eardington was not a suitable permanent terminus to the line, owing to the difficulties of road access and inadequate parking space.''"<ref>SVR News 27, ''The Proposed Bridgnorth By-pass'', R.H. Dunn</ref>
In early 1974 the Board reported that "''The circumstances under which Eardington loop was planned have so altered that it is unlikely to be needed. It is proposed to convert it to a siding, controlled from a ground frame at the south points, with the proposed platform area levelled off to form a loading bank and car park''."<ref>SVR News 31, ''Boardroom Notes'', David Mellor</ref> By winter 1974-5 the loop had been converted to a siding to for PW use. The two points at the north end which formed a crossover were both removed; the former point in the main line was reused at [[Arley]] while the point from the loop was taken to Bridgnorth for use in the loco yard. The single-bladed trap at the south end was not considered suitable for a siding opening onto a passenger carrying line, so was replaced by a double-bladed trap.<ref>SVR News 34</ref> Since that time the siding is regularly used for storing Permanent Way rolling stock.
==Current and former points of interest==
===Locomotive watering facility===
A water tank for Eardington was acquired by the SVR [[Severn Valley Railway Society ]] from Withymoor, Netherton (near Dudley) in the summer of 1967 and transported to Eardington. It was installed in time to be used for the 1968 Steam Gala. It was assisted in part by school parties from the The Royal School Wolverhampton under its history teacher, Brian Kingshott.<ref>Robert Betts and Nick Neath in Unofficial SVR Facebook post 22 April 2021</ref> The decision to install the SVR’s first proper watering facility at Eardington rather than Bridgnorth was due to Eardington having naturally soft water compared with very hard water at Bridgnorth.
At opening in 1970, the timetable allowed a 5 minute stop southbound at Eardington for locomotive watering; passengers frequently took the opportunity to photograph the locomotive or buy pop and sweets which were sold at the station. Once watering facilities were installed at Bridgnorth, this was reduced to one minute, effectively ending this practice.
===Lamps===
An electricity supply has never been installed. The 'Friends' have developed a collection of vintage [http://tilleylamp.co.uk/ Tilley lamps] with a railway provenance, to light the station after dark when open for galas and special occasions.<ref name="SVROnlineForum"/> Eardington is the only remaining station in the UK that is lit entirely by oil lamps. The permission granted in 2023 by the ORR is conditional upon trains not stopping after darkness.
===Former Bath Road turntable===
=== Early Booking Porters and Station Masters at Eardington===
The first description of ‘Station Master’ in GWR records is in 1879. It seems likely that where no station master is shown. , then the booking porter supervised the station. From 1949 Eardington was supervised from Bridgnorth.
{| class="wikitable
|William Sherwood||15 November 1846 Bidford, Warwickshire|| data-sort-value="1/1/1883" | January 1883||data-sort-value="1/1/1887" | January 1887||Booking Porter. Previously employed at [[Hartlebury]] on the branch, amongst other stations. Later Station Master at [[Hampton Loade]] and [[Berrington]].
|-
|Henry Powell||1836 Ombersley, Worcestershire|| data-sort-value="1/1/1887" | January 1887|| data-sort-value="1/6/1887" | June 1887|| Booking Porter. Served his entire railway career on the Severn Valley Branch, and censuses 1871 and 1881 record him as station master at [[Highley]].
|-
|William George Cleeton||1859 Broseley, Shropshire|| data-sort-value="5/5/1890" | May 1890||data-sort-value="24/8/1891" |August 1891||Booking Porter, then Station Inspector, Census of 1891 records Station Master. Employed at [[Coalport]], Buidwas [[Buildwas]] and Bridgnorth before Eardington, and later Station Master at Hampton Loade and Berrington.
|-
|George Walter Cooke||1865 Eardington, Shropshire|| data-sort-value="24/8/1891" | August 1891||data-sort-value="1/4/1930" | April 1930|| Station Master
* 1884 OS map showing the position of the station in relation to the river and iron works. Unfortunately, the station lies across the join between two maps and the track detail is not very clear.
* 1903 OS map on which the loop and headshunt can be seen more clearly. By this date, the iron works was disused.
* 1905 GWR schematic plan of Eardingtony Eardington giving siding capacity and other details.
<gallery mode=packed heights=150px style="text-align:left">
Trustworthy, administrator
6,720
edits

Navigation menu