'''Eardington ''', sometimes referred to as "Eardington Halt", is a disused station, situated on [[Eardington Bank]] and located mid-way between [[Bridgnorth]] and [[Hampton Loade]] at milepost 147¾. Although the station does not currently feature in daily operations a dedicated 'Friends of Eardington Station' team lead by Steve Downs looks after and maintains this wayside gem.
==Eardington history before preservation==
The southern end of the platform was cut back after it collapsed. The Friends held a fundraising appeal in 2014 to replace the missing part;<ref>SVRA Working Members Newsletter November 2014</ref> it was reported on 27 October 2016 that sufficient funds had been raised to purchase the required replacement GWR bricks.<ref>[https://twitter.com/Eardingtonstn/status/791730973977219072 Eardington Station Twitter Feed], retrieved 1 November 2016</ref>
A project commenced during the January 2018 winter shutdown involving the partial rebuilding of the platform face.<ref>[https://svrtrust.org.uk/downloads/Platform%202018%20web%20version-1.pdf 'Platform' magazine, 2018 Issue 4, p.5]</ref> Some 8000 engineering bricks recovered from the London – Bristol mainline and donated by Kier Construction have been used. These have been cleaned up by the Friends of Eardington Station over a period of time and provide a genuine connection to the GWR. The rebuild was undertaken by JSR Construction who are based less than a mile away from the station, thus keeping the work local.<ref>[https://www.svrlive.com/eardington-station SVRLive 'Eardington Station' 13 January 2018]</ref><ref>[https://www.svrlive.com/winter-works-2018 'SVRLive Winter Works 2018' 16 January 2018]</ref> Work was completed on 31 January 2019, giving the station a full length working platform of 300' - roughly 5 coaches - for the first time since 1984. The £41,000 project was aided by donations from the [[Severn Valley Railway Charitable Trust Ltd| Charitable Trust]] and [[Severn Valley Railway Company Limited| the Guarantee Company]] of £6,500 each, with the remainder being raised by the Friends. The project was completed on time and on budget. <ref>[https://www.svrlive.com/eardington-station SVR Live February 2019]</ref><ref>[https://www.shropshirestar.com/entertainment/bridgnorth-entertainment/2019/03/01/volunteers-on-severn-valley-railway-proud-to-unveil-new-platform/ Smith, R., 'Severn Valley Railway volunteers proud to unveil new platform', Shropshire Star, 1 March 2019] (Retrieved 3 March 2019)</ref> The rebuilding of rebuilt platform, which can be seen in the platform main photograph taken during the 2018 Goods Gala, improves greatly the appearance of the station and allows consideration to its possible use on gala events at some point in the future.
===Proposed reopening===
{{#coordinates:52.501739|-2.400062|[primary|][dim:1000]}}
{{StationNavbox}}
[[Category:Featured articles]]
Trustworthy, administrator
11,870
edits

Navigation menu