Changes

Jump to: navigation, search

Eardington

3 bytes removed, 23:16, 27 November 2022
m
Eardington siding: tidy reference
==Eardington siding==
A dead-end siding is accessed by a two-lever [[Eardington ground frame | ground frame]] at the south end. This is released by the [[Highley signal box|Highley]]-[[Bridgnorth signal box|Bridgnorth]] long section token, and was commissioned in 1976<ref>[http://svrsig.co.uk/svr/Frame8.htm Severn Valley Railway S&T Department (unofficial) website.]</ref>. The siding had been removed by BR in 1964 after closure of the line, but was reinstated in the early days of the SVR. In 1973 under Sir Gerald Nabarro's chairmanship, the siding was converted by contractors to a run-round loop at the then not insignificant cost of £8,000. This was seen as part of the plan to abandon Bridgnorth, which led to much unrest on the SVR at the time. In fact the connection at the north end would have been too tight for most locomotives, and was soon removed.<ref>Marshall, p180.<name=Marshall180/ref>.
The siding is regularly used for storing Permanent Way rolling stock.
Trustworthy, administrator
11,873
edits

Navigation menu